KITCHEN EXTENSIONS
The room your home is built around, expanded properly.
Bespoke kitchen extensions and single-storey additions, designed and built to feel like they were always meant to be there.
From contemporary rear extensions with sliding glazed walls to traditional side returns that restore proportion to a Victorian terrace, every kitchen extension we undertake is shaped around how a family actually lives.
We design with the architect's eye and build with the craftsman's hand.
Two-storey work, complex foundations, awkward site access, party-wall agreements, structural steels, we manage the technical detail so you can focus on the kitchen you'll use for the next twenty years.

What's included?
-
Architectural drawings and 3D visualisation
-
Full planning permission support
-
Structural engineering and party-wall
-
Building regulations sign-off
-
Kitchen design and installation
-
Single point of project management
COMMON QUESTIONS
Kitchen extension questions, answered.
Do I need planning permission for a kitchen extension?
Often not for a single-storey rear extension. Under permitted development you can usually extend 3 metres on a semi or terrace and 4 metres on a detached house, or up to double that through the prior approval route.
Side returns, two-storey extensions, listed buildings and conservation areas are where a full application usually comes in. We look at your property at the outset and tell you which route applies before any drawings are commissioned.
Will I need a party wall agreement?
If the work involves building on or near the boundary, cutting into a shared wall, or digging foundations close to a neighbour's, the Party Wall Act applies and notice has to be served before work starts.
It comes up on most side returns and terraced houses. We handle the notices and the surveyor process as part of the project.
How much does a kitchen extension cost?
There is no honest headline figure. Size, the amount of glazing, structural steels, foundations, drainage and the kitchen itself all move the number, and ground conditions can move it further.
We price each project properly after a site visit, so the figure you see is the one you build to.
How long does a kitchen extension take?
Most single-storey extensions run to a few months on site once planning and design are settled. Planning adds its own time before that, with councils aiming to decide householder applications within eight weeks. We give you a realistic programme once the design is fixed, not before.
Can we stay living at home during the build?
In most cases, yes. The bulk of the work happens outside the existing house.
The disruptive stretch is breaking through into the kitchen and the period when it is out of action, and we plan the sequence to keep that as short as possible.
Do you design and fit the kitchen as well?
Yes. Kitchen design and installation sits inside the same project, alongside the drawings, planning, structural work and building regulations sign-off. One team, one programme, and nobody waiting on a separate kitchen company to turn up.